Neon drop · Free ship $75+ · Enter the grid
Signal · Product Feed

Basement to First Floor Size:XS The space sits above a

SKU: 99157417867

4.7
USD100.00 USD132.00

Pay in 4 interest-free payments of $25.00 Learn more

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 16 - Aug 21

Live Spec

Basement to First Floor Size:XS The space sits above aA stairwell opening choked with collapsed office chairs, timber boards, and broken furniture, concrete block walls covered floor to ceiling in graffiti tags. This was the basement level of ABBCO Bakery in Leichhardt, photographed in 2015 while the factory sat abandoned. By 1973 the building housed two roll machines producing six thousand dozen rolls per hour. Part of the ABBCO Bakery series.

Store: trulybuild.in · Domain: trulybuild.in

Description

The space sits above a site that operated from 1884 until August 1988

Chemical Storage at Kaga

debris and a rusted pipe cover the floor

The anchor windlass sits forward on MV Cape Don's deck

has gathered decades of dust

Basement to First Floor Size:XS The space sits above aA stairwell opening choked with collapsed office chairs, timber boards, and broken furniture, concrete block walls covered floor to ceiling in graffiti tags. This was the basement level of ABBCO Bakery in Leichhardt, photographed in 2015 while the factory sat abandoned. By 1973 the building housed two roll machines producing six thousand dozen rolls per hour. Part of the ABBCO Bakery series.

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

You may also like

recommand products